Hussmann austral DD DELI-1 Series Скачать руководство пользователя страница 12

PRODUCT INSTALLATION MANUAL

 

                                                                                                                   

DD13 2T SERVICE DELI 

 

_________________________________________________________________________________________________________________________                                                                                                                                                                                                                                                      
Page 11

 

                                                                                                              Hussmann

 

Joining the Cases

 

 

Ensure cases are sealed before joining them to other cases 
 
For instructions on attaching case ends, refer to appendix 4: attaching case ends 
 
 

 

CAUTION

 

Do not walk or sit on cases.

 

 
 
To join the cases 
 

1.  Draw up the required case tightly against the case already in position 
 
 

 

CAUTION

 

Case joining bolts should only be used, 
with care, at the final pulling-up stage.

 

 

 
2.  Ensure that the case is level, from front to back and side to side, with the existing case. 
 
3.  Insert the joining bolts, found in the blister pack, into the end holes and tighten 

– see Fig (9): joining hole locations 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

Fig (9) Joining holes location 

 

 

Joining Holes 

Содержание austral DD DELI-1 Series

Страница 1: ...DD DELI 1 SERIES SERVICED DELI INSTALLATION MANUAL IM 012 Standard remote versions The following models are covered by this Manual DD13 66 Glendenning Road Glendenning NSW 2761 PO Box 42 Doonside NSW...

Страница 2: ...power supply 18 Installing sensor probes 19 Mounting fixtures 20 Commissioning 21 Cleaning case 21 Starting up 21 Start up checks 21 Decommissioning 22 Disposal 22 Operation 22 Loading Merchandise 22...

Страница 3: ...ement will be instructed in Pre installation section Before installing the system make sure the power source is accessible to the cases array All the power source has to be properly earthed If any pot...

Страница 4: ...L DD13 2T SERVICE DELI _________________________________________________________________________________________________________________________ Page 3 Hussmann Case Services Dimensions Fig 1 Service...

Страница 5: ...y management Refer page 27 Risk Analysis For MSDS sheet contact your Hussmann Representative Handling and Transporting cases MANDATORY USE OF STRAP AND EDGE PROTECTORS FOR THE TRANSPORTATION OF HUSSMA...

Страница 6: ...roduct engineering data PED sheets This manual is a guide only Always refer to the latest case information available from Hussmann Customer Service Always ensure that the moving device is of a suitabl...

Страница 7: ...amage 3 Any damage must be noted on the freight documentation supply by the transport company and contact a Hussmann representative within 48 hours 4 Take clear and accurate photos of damage parts wit...

Страница 8: ...ng Each case has a unique identification number as follows Job no Line up no Case sequence no within line up Example 106076 42 4 identifies this case in the 4th sequence of the line 42 for the job 106...

Страница 9: ...s not level determine where the highest point of the plinth is and position the case allocated to this position first 3 Adjust the case height using the adjustable feet if fitted or metal shims do NOT...

Страница 10: ..._____________________________________________ Page 9 Hussmann Fig 6 Case Levelling Fig 7 Case twisting Make sure case is level Front to Back 1 5mm Side to Side 1 5mm Make sure all adjusting feet NOT j...

Страница 11: ...d air leakage To seal the joins 1 Remove the shelves and racks from the end bays if necessary 2 Remove the pan decks 3 Apply a bead of sealant approximately 10mm wide ensure case seal correctly Fig 8...

Страница 12: ...refer to appendix 4 attaching case ends CAUTION Do not walk or sit on cases To join the cases 1 Draw up the required case tightly against the case already in position CAUTION Case joining bolts should...

Страница 13: ...con 5 Apply either black or white silicon depending on the interior colour of the case all the way along the inside join between the cases as supplied 6 Applying slight pressure run your finger along...

Страница 14: ...___________________________ Page 13 Hussmann Attaching Trims 1 Attached joining trims refer figure 11 2 Ensure that the case is level from front to back and push them together 3 Place trim to back of...

Страница 15: ...es and if required silicon seal to the floor once installation is complete and drains checked for water leaks Front Panel 1 Attached front panel and align with front skid rail refer figure 12 2 Push f...

Страница 16: ...______________________________________________________ Page 15 Hussmann Side kickplate 1 Attached side kickplate as per drawing refer figure 14 2 Adjust slot in kickplate to suit Make sure kickplate i...

Страница 17: ...n up stand The evaporator coils have been charged with dry nitrogen in the factory Fig 15 Refrigeration access holes CAUTION Do not run refrigeration lines from another compressor through a case Since...

Страница 18: ...s to ensure they are free of leaks 8 Dehydrate the refrigeration system using the triple evacuation method Use a vacuum pump to 1000 microns for the first two evacuations and 500 microns on the third...

Страница 19: ...is primed before starting refrigeration Connecting Power Supply only for electronically controlled versions The appliance must be installed so the power is accessible To ensure that the appliance is...

Страница 20: ...s pre fitted at the factory Probe location as per Fig 17 CAUTION Refer to relevant State or Territory legislation relating to safe working heights Probe location 1 Air off probe in the ceiling panel 2...

Страница 21: ...__________________________ Page 20 Hussmann Mounting fixtures Replace racks and shelves etc as necessary to store requirements Fitting racks and shelves In manners other than configured as per the pro...

Страница 22: ...ng the waste drain 2 Check that all fans and lights and light RCDs if installed are working correctly 3 Check the anti sweat circuit ensuring the thermostat is set correctly If installed 4 All electri...

Страница 23: ...tallation listed previously Disposal Case disposal is to be carried out by the following 1 Metal component removed and recycled 2 Remaining by commercial waste management Operation Loading Merchandise...

Страница 24: ...nspection isolate case power and contact service contractor Visually inspect drain strainer and drain for any debris which could result in the drains becoming blocked with the possibility of spilling...

Страница 25: ...erforations in the rear panels and the air return grille with a clean soft cloth and mild soapy water 7 Wipe over with clean dry cloth 8 Remove the base trays wash with mild soapy water and rinse 9 Re...

Страница 26: ...nents including solenoid valves fans controls earth terminals and lights are sound 9 Carry out electrical safety tests including earth continuity and insulation resistance 10 Ensure that the correct f...

Страница 27: ...ore operating condition A colder store may require longer defrost duration A humid store may need more frequent defrost Case shelf arrangement has been deviated significantly from original specified s...

Страница 28: ...service P1 P2 P3 P4 P5 P6 Sensor break down value out of range or sensor incorrectly configured Check the sensors rating condition and replace if necessary HA Room temperature exceed the highest room...

Страница 29: ...sionally need to be attached to a case on site Use this procedure when an end attaches to a single case and when it is common to two cases Ensure that correct and appropriate manual handling technique...

Страница 30: ...end fits comfortably around the canopy and the top of the case is level from front to back with case roof 6 Apply grey silicone along the inside and outside joins between the case end and end frame Se...

Страница 31: ...n be adjusted with by moving the neoprene washer supplied under the glass panel The neoprene washer is located under the glass mounting fasteners between the glass and the top of the case Should the f...

Страница 32: ..._____________________________________________________ Page 31 Hussmann Should the front gap required to be reduced the neoprene washer will need to be fitted under the back glass fastener This will li...

Страница 33: ...LATION MANUAL DD13 2T SERVICE DELI _________________________________________________________________________________________________________________________ Page 32 Hussmann Appendix 6 Front door camb...

Страница 34: ...ngers may become pinched or crushed during the positioning of base trays shelves stock Staff must be trained in the correct procedures for setting up cases and ergonomic practices Slipping Drain may l...

Страница 35: ..._________________________________________________ Page 34 Hussmann Electrical Potential of wire short circuit when installing screws during drilling works Electrically isolate case before work begins...

Страница 36: ...pproval 45bar 652 psi Refrigerant temperature 40T70oC Room Temperature 30T70oC Phase Current 450mA Drive frequency 50Hz 150Hz Phase resistance 25 oC 36ohm 10 IP Rating IP65 Step angle 15o Linear advan...

Страница 37: ..._____ Page 36 Hussmann Appendix 9 Warranty The information in this manual is for Qualified Persons Only It is NOT an Installation Guide for NON Qualified Persons To obtain warranty information or othe...

Отзывы: