11 SERVICE WORK ON THE CHASSIS
73
H01759-10
Main work
–
Remove screws
1
. Pull out inner tube
2
.
–
Remove the glass fiber yarn filling
3
from the inner tube.
–
Clean the parts that need to be reinstalled and check for
damage.
–
Fit the new glass fiber yarn filling
3
into the inner tube.
–
Slide outer tube
4
over the inner tube with the new glass
fiber yarn filling.
–
Mount and tighten all screws
1
.
Guideline
Screws on the main
silencer
M5
7 Nm (5.2 lbf ft)
Finishing work
–
Install the main silencer. (
–
Install the right side cover. (
11.31
Removing the right side cover
K00904-10
(TC 250)
–
Remove screw
1
.
–
Pull off the side cover sideways in areas
A
and
B
, and
remove toward the front.
K00906-10
(TX 300)
–
Remove screw
1
.
–
Pull off the side cover sideways in areas
A
and
B
, and
remove toward the front.
Содержание TC 125
Страница 1: ...OWNER S MANUAL 2018 TC 250 TX 300 Art no 3402165en ...
Страница 2: ......
Страница 145: ...21 TECHNICAL DATA 143 Nut primary gear M18LHx1 5 150 Nm 110 6 lbf ft Loctite 648 ...