7 HANDLEBAR,CONTROLS
- Check that screw
O
is firmly seated.
Guideline
Screw, fixed
grip
M4
5 Nm (3.7 lbf ft)
Loctite
®
243
™
I The diamond
e
must be located at the top.
7 .5
Checkin throttle cable routin
48
Preparatory work
- Remove the air filter box cover. (
0
p. 96)
- Remove the seat. (
0
p. 100)
- Remove the right side cover. (
0
p. 100)
- Remove the fuel tank. (
0
p. 102)
Main work
- Check throttle cable routing.
Both throttle cables must be routed, side by side, on the
back of the handlebars and above the fuel tank bracket,
to the throttle valve body. Both throttle cables must be
secured behind the rubber strap of the fuel tank support.
If the throttle cable routing is not as specified:
- Correct the throttle cable routing.
Finishing work
- Install the fuel tank. (
0
p. 103)
- Install the right side cover. (
0
p. 100)
- Mount the seat. (
0
p. 101)
- Install the air filter box cover. (
@:!l
p. 96)
Содержание FC 450 2018
Страница 2: ......
Страница 159: ...BRAKE SYSTEM 16 Check the foot brake lever for a firm pressure point 157 ...
Страница 297: ...SERVICE SCHEDULE 28 295 ...