21
English
• On receiving the machine check its condition.
• Always keep it perfectly clean
• Check regularly that the engine is serviced (petrol
engine), the state of the supply cable and
extension cable (for electric motor).
• Always keep alert when working
• Check that the parts are properly fixed (no
abnormal vibration) and that it is correctly
assembled.
3
Description of the machine
SEE FIG. 1
1
- Safety lever (dead man’s handle)
2 -
Steering shaft
3
- Depth adjustment knob (mm)
4
- Spanner
5
- Shaft adjustment knob
6
- Quick raise/lower lever
7
- Sling loop
8
- Engine / Motor
9
- On / off switch
10
- Belt guard
11
- Chassis
12 -
Belt tensioner
13
- Drain extension
14
- Quick release guard
15
- Centring dome nuts
16
- Dust extractor hose
17
- Transmission
18
- 200 mm wide drum
19
- Floor edge drum
(optional)
20
- Supply cable
4
Handling - Transport
• The height of the steering shaft can be adjusted
by slackening the knob
(H)
[
SEE FIG.
2].
• Upon installation at the work site, the machine
can be moved without running the engine simply
by pushing it along on its three wheels.
• A slinging ring
(A)
enables the lifting ot the
machine.
5
Interchange of drums
• Unscrew the three drum centring dome nuts
(F)
[
SEE FIG.
3].
• Remove the right shield
(G)
.
• Fit the drum
(H)
and slid it on its shaft
(J)
.
• Refit the shield.
• Tighten the capnuts.
• To mill up to a wall, fit the side drum
(K)
, housing
(L)
, plate
(M)
and bearing
(N)
in the place of the
original drum and plate [
SEE FIG.
4].
Motor off.
Take care to avoid accidental
damage.
Disconnect the machine.
The working area must be
completely cleared, well lit and all
safety hazards removed (no water or
dangerous objects in the vicinity)
The operator must wear
protective clothing appropriate to
the work he is doing. We
recommend that this includes
both eye and ear protection
Any persons not involved in the work
should leave the working area
Please read the instructions for use
prior to operating the machine for
the first time.
The use of ear protection is
mandatory.
6
Check before starting
Содержание CG 200 S
Страница 2: ......
Страница 53: ......
Страница 54: ......
Страница 67: ......
Страница 68: ...2007 01 15 www husqvarnacp com 115 04 72 20 ...