
Initial Unit Set-Up
771402-2 dopplex ABIlity Service Manual
12
4 Initial Unit Set-Up
On delivery of a new unit the battery will not be connected. Prior to performance testing the battery will need to
be connected and conditioned. The conditioning routine will automatically operate when the dopplex Ability is
switched on for the first time.
4.1
Battery Connection
Make sure the unit is
NOT
connected to the mains supply before proceeding.
4.1.1
Invert the unit and remove the battery cover by removing the
securing screw using the Allen key
provided.
4.1.2
Lift the battery out, and connect the battery to the unit.
4.1.3
Replace the battery, re-fit the battery cover (ensure that the air filter is still in place) and replace the
securing screw with the Allen key provided.
DO NOT OVERTIGHTEN!
The battery should now be conditioned by connecting the unit to the mains supply. The battery conditioning
mode will automatically start when the unit is first switched on. Battery conditioning will take 8-10 hours. When
complete the unit will switch off automatically.
Содержание DA100PB
Страница 1: ...771402 2 dopplex ABIlity Service Manual 1 SERVICE MANUAL ...
Страница 15: ...Product Description 771402 2 dopplex ABIlity Service Manual 15 ...
Страница 22: ...System Block Diagram 771402 2 dopplex ABIlity Service Manual 22 6 7 Pneumatic Circuit Diagram ...
Страница 23: ...System Block Diagram 771402 2 dopplex ABIlity Service Manual 23 ...
Страница 24: ...System Block Diagram 771402 2 dopplex ABIlity Service Manual 24 ...
Страница 29: ...Product Specifications 771402 2 dopplex ABIlity Service Manual 29 8 4 General ...
Страница 66: ...Fault Modes 771402 2 dopplex ABIlity Service Manual 66 Figure 3 Inflation Envelope ...