background image

5

ERT7 and ERT8 Ebbert Rivet Tools (HK1061)

    

PULL CYCLE

When the trigger is pressed, the incoming non-oiled plant 

air, regulated at 90 psi forces the Piston Assembly and 

Double Piston to the rear of the tool, and air is exhausted 

out the bottom of the tool. The fastener is installed, and 

the fastener pintail breaks off.

NOTE: The ERT8 exhaust air exits through small holes 

in the bottom of the Valve Body. (See Item 16 of ERT8 

Assembly Drawing in this manual.)

RETURN CYCLE

When the trigger is released, the pressurized air is 

directed to the rear of the pistons, causing them to move 

forward. The fastener pintail is vacuumed out the rear of 

the tool and into the Power Unit Pintail Collection bin, 

and the tool is ready for the next fastener installation.

Principle of Operation

Preparation for Use

1.  Use Ebbert Power Unit Model 

EPS6V or EPS6VL, 

that has been prepared for operation per applicable 

instruction manual. Check incoming pressures and, if 

necessary, adjust to the recommended pressures in 

Specifications

 of this manual.

2.  Turn OFF the Ebbert Power Unit, and then disconnect 

the power supply from the unit. Connect the tool’s 

hoses to the unit.

3.  Connect the cable attachment from hose assembly 

to cylinder base of tool.

4.  Connect the Ebbert Power Unit to the power supply. 

Turn ON the unit. Press and hold the tool trigger 

for 30 seconds; then 

press the trigger a few times 

to cycle the tool. Observe the action of the tool and 

check for air leaks. Turn OFF the unit.

5.  Select the pulling head assembly for the fastener to 

be installed and attach per instructions in 

Attaching 

Nose Assembly to Tool

 on the next page of this 

manual.

6.  Reconnect the Ebbert Power Unit to the power 

supply. Check the operation of the pulling head 

assembly; install fasteners in test plate of correct 

thickness with proper size holes. Inspect the installed 

fasteners.

Содержание ERT7

Страница 1: ... ERT7 and ERT8 Ebbert Rivet Tools Safety Instructions 3 Specifications 4 Warning Stickers 4 Principle of Operation 5 Preparation for Use 5 Attaching Nose Assembly to Tool 6 Kits and Accessories 6 Troubleshooting 6 Maintenance 7 Disassembly Instructions 8 Assembly Instructions 8 Components Drawings 9 10 ...

Страница 2: ...2 ERT7 and ERT8 Ebbert Rivet Tools HK1061 ...

Страница 3: ...suitable postures as it is likely for these not to allow counteracting of normal or unexpected tool movement 8 If the assembly power tool is fixed to a suspension device make sure that fixation is secure 9 Beware of the risk of crushing or pinching if nose equipment is not fitted IV REPETITIVE MOTION HAZARDS 1 When using assembly power tool the operator can experience discomfort in the hands arms ...

Страница 4: ...PERATORS TO PREVENT PERSONAL INJURY 590561 590350 Where the following trade names are used in this manual note DEXRON is a registered trademark of General Motors Corporation GLYD Ring is a registered trademark of Trelleborg Sealing Solutions Germany GmbH Loctite is a registered trademark of Henkel Corporation U S A LUBRIPLATE is a registered trademark of Fiske Brothers Refining Co MERCON is a regi...

Страница 5: ...el EPS6V or EPS6VL that has been prepared for operation per applicable instruction manual Check incoming pressures and if necessary adjust to the recommended pressures in Specifications of this manual 2 Turn OFF the Ebbert Power Unit and then disconnect the power supply from the unit Connect the tool s hoses to the unit 3 Connect the cable attachment from hose assembly to cylinder base of tool 4 C...

Страница 6: ...reak a Improper tool operation See No 5 b Incorrect fastener size or type c PULL pressure too low 7 Pulling Head will not release broken pintail a Pulling Head assembly not correctly installed b Tool or Pulling Head may need cleaning 8 Excessive air leaking from trigger and tool will not function a Green and red air hoses may be switched Service Kit ERT7 and ERT8 300471 This kit is for both tools ...

Страница 7: ...regular retailer of these items See Parts List for O ring size AS568 number material durometer For kit parts lists and related information see Kits and Accessories PREVENTIVE MAINTENANCE System Inspection The operating efficiency of the tool is directly related to the performance of the complete system including the tool with pulling head assembly trigger control cord and Power Unit Therefore an e...

Страница 8: ...with mineral spirits or similar solvent Inspect for wear damage and replace as necessary Replace all seals of disassembled components Use O rings Quad rings and Back up rings in Service Parts Kit ERT5S7KIT or ERT8KIT Coat O rings seals Back up rings and mating parts with conventional O ring lubricant to ease assembly Assemble tool taking care not to damage O rings seals or Back up rings NOTE Insta...

Страница 9: ...66 Seal 2 10 500780 O ring 1 11 300063 Double Piston 1 12 500995 Retaining Ring 2 13 300071 Seal 1 14 300029 End Cap 1 15 506268 Male Connector 1 16 300107 Guard 1 17 300156 Valve Back up Ring 1 18 500779 O ring 1 19 300042 Handle 1 20 300251 Trigger 1 21 500623 Pin 1 22 507660 Bleed Screw 2 23 300064 Screw Bearing Plate 2 24 500064 Socket Head Screw 8 25 300114 Support Loop Assembly 1 26 500061 S...

Страница 10: ...Seal 1 14 300029 End Cap 1 15 506268 Male Connector 1 16 300037 Valve Body 1 17 300156 Valve Back up Ring 1 18 500779 O ring 1 19 300105 Handle 1 20 300252 Trigger 1 21 500623 Pin 1 22 507660 Bleed Screw 2 23 300064 Screw Bearing Plate 2 24 500064 Socket Head Screw 8 25 300126 Support Loop Assembly 1 26 500061 Socket Head Screw 4 27 508010 Piston Rod Wiper 1 28 501344 Dowel 1 29 300158 Valve 1 30 ...

Страница 11: ...rvice wear or as part of a complete overhaul Determination is made on a case by case basis upon return of parts to Huck International Inc for evaluation Tooling Part s and Other Items not manufactured by Huck HUCK makes no warranty with respect to the tooling part s or other items manufactured by third parties HUCK expressly disclaims any warranty expressed or implied as to the condition design op...

Страница 12: ...00 São Paulo SP Brazil Tel 55 11 3583 7061 Suzhou Operations 58 Yinsheng Road SIP Suzhou Jiangsu 215126 China Tel 86 512 62863800 8888 Telford Operations Unit C Stafford Park 7 Telford Shropshire England TF3 3BQ Tel 44 1952 290011 Fax 44 1952 207701 thisales arconic com Tokyo Operations Japan and Korea 1013 Hibiya U 1 Bldg Uchisaiwai cho 1 1 7 Chiyoda ku Tokyo 100 0011 Japan Tel 81 3 3539 6594 Fax...

Отзывы: