7
6
、
Click "clock modification" in figure 1 to enter the clock modification interface, as shown
in figure 6
:
Figure 6
Click
to set date and time
;
VI.Test And Operating
1.Connection
:
Connect the testing product to the device through test terminal, joint
firm;meanwhile insure a well connection of the earthing wire.
A: Single phase testing method, to see the following drawing.
A
B
C
I+
I-
被
测
试
品
测试仪
O
V+
V-
a
b
c
Testing
product
Measurement device
B. magnetic assisted connections see picture 3 to 5
(
suitable Y
(
N
)
-d-11junction group
)