If you connect a ground cable to the ground point in the maintenance
compartment, you are advised to use a four-core (L1, L2, L3, and PE) outdoor
cable.
●
You need to prepare the OT or DT terminal that matches the cable.
Table 5-1 AC power cable specifications
Cable Type
Conductor Cross-
Sectional Area
Cable Outer Diameter
Copper-core cable
50–240 mm
2
● Multi-core cable: 24–
66 mm
● Single-core cable: 14–
32 mm
Copper-clad aluminum
cable and aluminum
alloy cable
● Multi-core cable: 70–
240 mm
2
● Single-core cable: 70–
240 mm
2
NO TE
The cable diameter must comply with local cable standards. The factors that affect cable
selection include the rated current, cable type, routing mode, ambient temperature, and
maximum expected line loss.
Table 5-2 PE cable specifications
Conductor Cross-Sectional Area S of
the AC Power Cable (Unit: mm
2
)
Conductor Cross-Sectional Area S
P
of
the PE Cable (Unit: mm
2
)
S > 35
S
P
≥ S/2
The specifications are valid only if the conductors of the PE cable and AC power
cable use the same material. If the materials are different, ensure that the
conductor cross-sectional area of the PE cable produces a conductance
equivalent to that of the cable specified in this table. The specifications of the
PE cable are subject to this table or calculated according to IEC 60364-5-54.
Connecting the PE Cable
Step 1 Secure the PE cable using the ground screw.
SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0)
User Manual
5 Electrical Connections
Issue 02 (2020-10-30)
Copyright © Huawei Technologies Co., Ltd.
34