Figure 6-11
Wrapping the PVC insulation tape
4.
Installation engineer C pulls the lifting sling downwards, and installation engineer B pulls
the other end of the lifting sling outwards to protect the power cables from colliding with
the tower.
Step 2
Secure the power cables to the tower vertically using cable clips.
Step 3
Remove the cable ties, PVC insulation tape, and lifting sling.
NOTE
The procedure for hoisting the power cables onto the tower is for your reference only.
----End
6 Hoisting an RRU and Related Cables onto a Tower
Issue ()
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
47
Содержание RRU3971
Страница 1: ...Issue Date HUAWEI TECHNOLOGIES CO LTD ...