01 (2011-01-20)
This is the first official release.
Compared with draft A (2010-12-15), this issue does not include any new information.
Compared with draft A (2010-12-15), this issue includes the following changes:
Topic
Change Description
8.6 Installing an RRU RF Jumper
Added the procedures for installing DC
blocks when RRUs are installed in tunnels of
AC-powered electric railways.
8.10 Installing a CPRI Fiber Optic Cable
Added optical module types and rates.
Compared with draft A (2010-12-15), no information is deleted from this issue.
Draft A (2010-12-15)
This is a draft.
Compared with issue 02 (2010-07-30) of V100R002C00, this issue does not include any new
information.
Compared with issue 02 (2010-07-30) of V100R002C00, this issue does not include any changes.
Compared with issue 02 (2010-07-30) of V100R002C00, the following information is deleted
from this issue:
Topic
Deletion Cause
Adding terminals to the RRU power cable on
the power device side
The contents are the same as those in the
DBS3900 Installation Guide
.
Cable connections between an RRU and
auxiliary devices
The contents are the same as those in the
DBS3900 Installation Guide
.
RRU3201
Installation Guide
1 Changes in the RRU3201 Installation Guide
Issue 06 (2012-04-16)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3