2
Installation Preparations
About This Chapter
This chapter describes the reference documents, tools, and instruments that must be ready before
the installation. In addition, it specifies the skills and prerequisites that installation engineers
must have.
Before the installation, you must be familiar with reference documents.
All tools and instruments required for RRU installation must be ready before the installation.
2.3 Skills and Requirements for Onsite Personnel
RRU3201
Installation Guide
2 Installation Preparations
Issue 06 (2012-04-16)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4