Figure 10-11
Installing a new pDock mother board
Step 15
Install the light pipe, and use the M3 Phillips screwdriver to tighten the two fastening screws to
0.8 N•m, as shown in
Figure 10-12
Installing the light pipe
Step 16
Install the RF daughter boards in slots S1 and S2, and use the M4 Phillips screwdriver to tighten
the two fastening screws always carried on each daughter board to 1.4 N•m, as shown in
.
LampSite
Site Maintenance Guide
10 Replacing the pDock Mother Board
Issue 02 (2014-05-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
41