Step 8
Power on the RRU according to the instructions in
Step 9
Check whether CPRI signal transmission recovers by observing the CPRI indicator on the RHUB
panel.
If...
Then...
The CPRI indicator is green
CPRI signal transmission recovers and the
optical fiber replacement is successful.
The CPRI indicator is red or in another color CPRI signal transmission is abnormal. Check
whether the optical fiber and optical module
are securely installed.
Step 10
Take off the ESD gloves and pack up all the tools.
----End
Follow-up Procedure
l
Place the replaced optical module into an ESD box or bag. Then, place the ESD box or bag
into a foam-padded carton or the packing box of the new optical module.
l
Record the information about the faulty component in the fault card.
l
Contact the local Huawei office to deal with the faulty component.
LampSite
Site Maintenance Guide
7 Replacing an Optical Module
Issue 02 (2014-05-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
22