Safety Precautions 

1. General safety precautions

To ensure human safety and equipment security, pay attention to all the precautions marked on the 
equipment and instructed in the product documentation.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not 
represent all the safety instructions. They are only supplements to the safety instructions.

2. Local laws and regulations

Comply with local laws and regulations when operating the equipment. The safety instructions in 
the document are only supplements to the local laws and regulations. 

3. Personnel requirements

Personnel who plan to install or maintain Huawei equipment must receive a thorough training, 
understand all necessary safety precautions, and be able to perform all operations correctly.
• Only trained and qualified personnel are allowed to install, operate, and maintain the equipment.
• Only personnel certified or authorized by Huawei are allowed to replace or change the equipment 

or components (including software).

• Any fault or error that might cause safety problems must be reported immediately to a supervisor.

4. Grounding requirements

• When installing the equipment, ground it first.
• When removing the equipment, disconnect the ground cable finally.
• Do not damage the ground conductor.
• Do not operate the equipment in the absence of a properly installed ground conductor.
• The equipment must be grounded permanently. Before operating the equipment, check the 

electrical connection of the equipment to ensure that it is securely grounded.

5. Personal requirements

• Do not operate the equipment or cables during thunderstorms.
• Remove the AC power connector and do not use the fixed terminal or touch the terminal or 

antenna connector in a thunderstorm.

• Before operating the equipment, wear electrostatic discharge (ESD) clothes, ESD gloves, and an 

ESD wrist strap. Do not wear conductors such as jewelry or watches when operating the 
equipment.

• In the case of a fire, immediately leave the building or the equipment area, and turn on the fire 

alarm bell or make an emergency call. Never enter a building or equipment area that is on fire.

6. Equipment requirements

• Before operations, ensure that the equipment is firmly secured to the floor or other solid objects, 

such as a wall or an installation rack.

• Do not block the air vent while the system is operating.
• Tighten the screws using tools when installing panels.
• After installation, remove the packing materials from the equipment area.

1

Содержание PDU5000

Страница 1: ...HUAWEI TECHNOLOGIES CO LTD PDU5000 Quick Guide Parts No 02121671 Issue 01 Date 2019 01 10 ...

Страница 2: ... installing the equipment ground it first When removing the equipment disconnect the ground cable finally Do not damage the ground conductor Do not operate the equipment in the absence of a properly installed ground conductor The equipment must be grounded permanently Before operating the equipment check the electrical connection of the equipment to ensure that it is securely grounded 5 Personal r...

Страница 3: ...vice SPD switch 3 SPD 4 AC output circuit breaker 5 AC output terminal block 6 AC input terminal block 7 PE N A N A 1 Appearance dimensions of the PDU5000 2 Feature Introduction of the PDU5000 1 2 3 4 5 6 7 Front view of the PDU5000 Back view of the PDU5000 430 630 664 482 6 130 Front Back Unit mm ...

Страница 4: ... or the local Huawei office immediately 3 Unpacking and Acceptance Installing PDU5000 Cables 4 1 Elementary diagram of the PDU5000 2 Install cables for the PDU5000 by referring to the following figure S201 D63A 1 P 1QF FS 20K A QF2 C32A 1P QF3 C32A 1P QF4 C32A 1P QF5 C32A 1P QF6 C32A 1P QF7 B10A 2 P RCD QF8 B10A 2 P RCD QF9 B10A 1 P QF10 B10A 1 P QF11 B10A 1 P QFS C32A 2P QF1 C32A 1P RVVZ 3x6 RVVZ...

Страница 5: ...on Passed Failed 11 Cables are routed for ease of future maintenance and expansion Passed Failed 12 There is no unnecessary adhesive tape or cable tie on the cables Passed Failed 13 Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing Passed Failed 14 Flat and spring washers are properly installed on each bolt of a wiring terminal Passed Fail...

Страница 6: ...se to wipe the equipment is clean If the white paper is dirty clean the PDU5000 Routine Maintenance 7 Symptom Possible Causes Troubleshooting Measures The surge protection function fails The SPD circuit breaker is not turned on The SPD ground cable is not connected The surge protection module is abnormal The SPD window is red Check that the SPD circuit breaker is turned on Check that the SPD groun...

Страница 7: ...C Relative humidity 5 95 RH non condensing Altitude 2000 m Rated operating frequency 50 Hz Rated operating voltage 220 V AC Installation mode Installed inside a cabinet Protection level IP20 Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China www huawei com ...