3

• Unpack the equipment and visually inspect its appearance to check whether the equipment is 

paint-peeling, misshapen, scratched, or soaked. If so, record the information and contact the 
equipment carrier and the local Huawei office immediately. 

• Check against the packing list that the equipment and components are correct and complete. If 

some components are missing or do not conform to the packing list, record the information and 
contact Huawei or the local Huawei office immediately.

3

Unpacking and Acceptance

Installing PDU5000 Cables

4

1. Elementary diagram of the PDU5000.

2. Install cables for the PDU5000 by referring to the following figure.

S201-D63A/1 P

1QF

FS/20K A

QF2
C32A/1 P

QF3
C32A/1 P

QF4
C32A/1 P

QF5
C32A/1 P

QF6
C32A/1 P

QF7
B10A/2 P RCD

QF8
B10A/2 P RCD

QF9
B10A/1 P

QF10
B10A/1 P

QF11
B10A/1 P

QFS
C32A/2 P

QF1
C32A/1 P

RVVZ-3x6

RVVZ-3x6

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

RVVZ-3x1.0

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

L,N,PE

AC Input

AC Output

Equipment room PE

Input PE

Output PE

Содержание PDU5000

Страница 1: ...HUAWEI TECHNOLOGIES CO LTD PDU5000 Quick Guide Parts No 02121671 Issue 01 Date 2019 01 10 ...

Страница 2: ... installing the equipment ground it first When removing the equipment disconnect the ground cable finally Do not damage the ground conductor Do not operate the equipment in the absence of a properly installed ground conductor The equipment must be grounded permanently Before operating the equipment check the electrical connection of the equipment to ensure that it is securely grounded 5 Personal r...

Страница 3: ...vice SPD switch 3 SPD 4 AC output circuit breaker 5 AC output terminal block 6 AC input terminal block 7 PE N A N A 1 Appearance dimensions of the PDU5000 2 Feature Introduction of the PDU5000 1 2 3 4 5 6 7 Front view of the PDU5000 Back view of the PDU5000 430 630 664 482 6 130 Front Back Unit mm ...

Страница 4: ... or the local Huawei office immediately 3 Unpacking and Acceptance Installing PDU5000 Cables 4 1 Elementary diagram of the PDU5000 2 Install cables for the PDU5000 by referring to the following figure S201 D63A 1 P 1QF FS 20K A QF2 C32A 1P QF3 C32A 1P QF4 C32A 1P QF5 C32A 1P QF6 C32A 1P QF7 B10A 2 P RCD QF8 B10A 2 P RCD QF9 B10A 1 P QF10 B10A 1 P QF11 B10A 1 P QFS C32A 2P QF1 C32A 1P RVVZ 3x6 RVVZ...

Страница 5: ...on Passed Failed 11 Cables are routed for ease of future maintenance and expansion Passed Failed 12 There is no unnecessary adhesive tape or cable tie on the cables Passed Failed 13 Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing Passed Failed 14 Flat and spring washers are properly installed on each bolt of a wiring terminal Passed Fail...

Страница 6: ...se to wipe the equipment is clean If the white paper is dirty clean the PDU5000 Routine Maintenance 7 Symptom Possible Causes Troubleshooting Measures The surge protection function fails The SPD circuit breaker is not turned on The SPD ground cable is not connected The surge protection module is abnormal The SPD window is red Check that the SPD circuit breaker is turned on Check that the SPD groun...

Страница 7: ...C Relative humidity 5 95 RH non condensing Altitude 2000 m Rated operating frequency 50 Hz Rated operating voltage 220 V AC Installation mode Installed inside a cabinet Protection level IP20 Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China www huawei com ...

Отзывы: