iBAT 2.0-CIM01C2
User Manual
4 Connecting Cables
Issue 07 (2019-01-02)
Copyright © Huawei Technologies Co., Ltd.
38
Figure 4-8
Connecting the CIM power cables
Step 4
(Optional) If multiple CIMs are cascaded, setting the DIP switch.
Table 4-1
DIP switch settings
CIM
Toggle
Switch 1
(ADDR_1)
Toggle
Switch 2
(ADDR_2)
Toggle
Switch 3
(ADDR_3)
Toggle
Switch 4
(ADDR_4)
CIM
Address on
the
Monitoring
System
CIM1
OFF
OFF
OFF
OFF
60
CIM2
ON
OFF
OFF
OFF
61
CIM3
OFF
ON
OFF
OFF
62
CIM4
ON
ON
OFF
OFF
63