iBAT 2.0-CIM01C2
User Manual
3 Installing Devices
Issue 07 (2019-01-02)
Copyright © Huawei Technologies Co., Ltd.
27
M6: 4–6 N·m
M8: 13–15 N·m
M10: 15–20 N·m
Figure 3-10
Connecting battery cables
(1) Bolt
(2) Spring washer
(3) Flat washer
(4) OT terminal
(5) Battery connecting piece
Install a battery bolt in the following sequence: bolt > spring washer > flat washer > OT terminal >
battery connecting piece.
2.
Secure the BIM.
Figure 3-11
Securing a BIM
(1) Strip the adhesive tape from the BIM
fastener.
(2) Attach the BIM and press it for more than
10 seconds.
3.
After connecting all power cables to the system, connect the cable to the BIM.