3 Installing Devices
Issue 07 (2019-01-02)
Copyright © Huawei Technologies Co., Ltd.
21
In the figure, the circuit breaker panel of the battery cabinet has been removed. Before
removing the circuit breaker panel, knock off the cover on the CIM indicator hole on the
panel.
If battery cabinets are combined, remove the side panels between the battery cabinets.
If the battery string is configured with the neutral wire, measure the currents of the
positive
and
negative battery string cables. If the battery string is not configured with the
neutral wire, measure the current of either the positive
or
negative battery string cable.
The following uses the scenario where the battery string is configured with the neutral
wire as an example.
Figure 3-2
BIM installation position
The battery appearance is for reference only.
Procedure
Step 1
Install a BIM.