NOTE
Do not take out a G530 V2 from its ESD bag if you do not install it immediately.
Figure 4-19
Incorrect operations
Step 3
Install the G530 V2.
NOTE
Install filler modules in empty slots to avoid system alarms or performance deterioration.
1.
Press the unlock button on the G530 V2. See (1) in
.
Figure 4-20
Install a G530 V2
2.
Open the ejector lever on the G530 V2 completely. See (2) in
.
FusionServer G5500 Server
User Guide
4 Setup
Issue 02 (2017-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
64