Figure 3-2
Power Control page
3
Click
Power On
. In the displayed dialog box, click
OK
to power on the compute node.
----End
Verification
Check the indicator status after the compute node is powered on.
3.3 Removing the G560
Step 1
Power off the G560. For details, see
3.1 Powering Off the Compute Node
Step 2
Determine the position of the node. See
. The G560 is in the lower slot and the
GP608 is in the upper slot.
Figure 3-3
Node slots
FusionServer G5500 Server
User Guide
3 Basic Operations
Issue 02 (2017-12-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
36