7.2.5.2 Installing a Server on Holding Rails
7.2.4.3 Installing Holding Rails
Procedure
Step 1
Install the server.
NO TICE
At least two people are required to move the device. Otherwise, personal injury or device
damage may occur.
1.
Pull out the inner rails as far as they will go.
Figure 7-9
Pulling out an inner rail
2.
Lift the server (at least two people are required), align the nail heads on the server with
the L-shaped cutouts on the inner rails, and push the server until it clicks into position.
See (1) and (2) in