FusionModule1000B Air-Cooled IT Solution
Maintenance Guide
6 Parts Replacement
Issue 02 (2017-01-10)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
180
Figure 6-98
Installing the battery protective panel
Step 7
Check whether the new VESDA batteries are working properly.
Turn on the standby power switch. If the power fault indicator is off, the batteries are working properly.
----End
Follow-up Procedure
Dispose of the removed VESDA power box batteries that are confirmed faulty.