29
Remove the 4 black plastic covers at the bottom of
the battery compartment, then use 4 screws to
fasten the cabinet, and then install the 4 black
plastic covers back.
Remove the four mounting feet of the cabinet.
Apply sealing materials (such as silica gel and
sealing mud) at the holes left after the mounting
feet are removed and use screw-hole plugs to block
the holes.
Fence the cabient after it is installed.
Waterproof silicone
Screw-hole plugs
Содержание F01T500
Страница 1: ...HUAWEI TECHNOLOGIES CO LTD F01T500 Quick Installation Guide Issue 07 Date 2017 05 03 ...
Страница 19: ...With battery cabinet 4 Installing the Cabinet on a Concrete Pedestal 14 ...
Страница 23: ...18 Unit mm 4 Installing the Cabinet on a Concrete Pedestal ...
Страница 25: ...20 4 Installing the Cabinet on a Concrete Pedestal ...
Страница 27: ...22 4 Installing the Cabinet on a Concrete Pedestal ...
Страница 36: ...31 Install the power meter box Seal the power meter box Fence the cabient after it is installed ...
Страница 38: ...33 With power meter box ...
Страница 40: ...35 With power meter box AC power cables AC power cables ...
Страница 44: ...39 6 Routing Cables 6 3 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Страница 49: ...44 6 Routing Cables 6 7 Diagram of Cable Connections Between the RPS and MDF AC RPR Power Supply ...
Страница 51: ...46 Route the input Cables of the AC RPR power supply 6 Routing Cables ...
Страница 83: ...14 FAQs for Installation 78 ...
Страница 84: ...15 FAQs for Installation 79 ...