52
16 Powering On the System(AC-powered
device)
•
The cabinet must be powered on within seven days after installation.
•
During the power-on, before and after turning on each of the MCBs for the first time, you need to use a
multimeter to check the input and output voltages and ensure that the voltages are normal (AC ranges: 200
VAC to 240 VAC; DC range: -42 VDC to -58 VDC).
•
After installing the cabinet and powering on the device, ensure that the battery switch is in the ON state. If the
device needs to be powered off, you must first turn off the battery switch and then turn off the AC switch.
Use the multimeter to test the input voltage for the
device.
Turn on the switches of the AC PDU.
Check whether the status of the power supply, fan,
monitoring, and board running indicators of the AC
main equipment is normal. The following figure
shows the position and status of the running
indicator.
Steady green
Steady green
Indicators on the MA5818 power board
Indicators on the MA5818 fan tray
Green: On for 1s and
off for 1s repeatedly
Содержание ETP4860
Страница 1: ...HUAWEI TECHNOLOGIES CO LTD F01T100 ETP4860 Quick Installation Guide Issue 01 Date 2019 09 30 ...
Страница 33: ...30 11 Routing Cables 11 5 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Страница 61: ...22 FAQs for Installation 58 ...
Страница 62: ...23 FAQs for Installation 59 ...