•
After routing external user cables into the cabinet, reserve an extra length so as to clamp the cables to the
cable side terminal block on the MDF.
• You must preprocess the external subscriber cables after routing the external subscriber cable into the
cabinet. For detailed operation, see Appendix A Preprocess the External Subscriber Cables.
•
When the service is enabled in the future, the protective unit must be installed for the cable side terminal
block correctly.
26
11 Routing Cables
11.3 Routing Subscriber Cables
Cable hole for subscriber cable
Cable hole for subscriber cable
Front door side of the cabinet
Front door side of the cabinet
Subscriber
cables
To the
distribution box
outside of the
cabinet
Wire cutter
Protective unit
Protective unit
Battery compartment bottom (top view)
Cabinet bottom (top view)
MDF
Labeling block
Ground cable
for subscriber
cables
Содержание ETP4860
Страница 1: ...HUAWEI TECHNOLOGIES CO LTD F01T100 ETP4860 Quick Installation Guide Issue 01 Date 2019 09 30 ...
Страница 33: ...30 11 Routing Cables 11 5 Diagram of Cable Connections Between the RPS and MDF RPS Power Supply ...
Страница 61: ...22 FAQs for Installation 58 ...
Страница 62: ...23 FAQs for Installation 59 ...