3 Commissioning Process
Issue 02 (2006-10-10)
Huawei Technologies Proprietary
3-7
Table 3-3 lists the indicator status when the BTS downloads data configuration files.
Table 3-3
Indicator status when the BTS downloads data configuration files
Observation
Method
Description
Through the
indicators of the
BTS
The board resets. After the boards run normally, the ACT indicator
switches on.
At the service
maintenance system
After the configuration, you can view the running status of all the
boards on the equipment panel.
Observing the
correlated alarm
The alarm related to link interruption is generated.
Setting Up Traffic Links
After the BTS obtains a stable clock signal, the CCPM or the CECM sets up the Abis traffic
link through the BCIM according to the configuration parameter obtained from the operation
& maintenance unit (OMU). Then the CCPM or the CECM exchanges traffic data with the
BSC.
Setting Up Signaling Links
After the configuration, the BCKM sets up the Abis signaling link to communicate with the
BSC through the BCIM according to the configuration parameter obtained from the OMU.
When the Abis signaling link is interrupted, the BTS resets automatically 10 minutes later.
Setting Up Cells
After the Abis signaling link is set up, the BCKM reports the BTS resource configuration state
to the BSC and requests logical configuration.
After the BSC sends the cell configuration data to the BCKM, the BTS configures the carrier
properties, sets up the common channel, and updates the overhead message. After that, the
MS is allowed to access the network and make a call.
3.3 Starting Local Maintenance
This section describes the process of starting local maintenance.
3.3.1 Configuring the WS
Task Description
Configure the IP address of the WS which is used for commissioning.