3 Commissioning Process
Airbridge BTS3606E&3606AE
System Commissioning Guide
3-2
Huawei Technologies Proprietary
Issue 02 (2006-10-10)
3.1 Commissioning Flowchart
Figure 3-1 shows the flowchart for BTS commissioning.
Figure 3-1
BTS system commissioning flowchart
Start
BTS Startup Process
Starting Local
Maintenance
O&M Test
RF Performance Test
Service Function Test
End
Configuring the WS
Logging In to the BTS in
Telnet Mode
Configuring the IP
Address and Routeing
Information of the BTS
Starting the LMT
Logging In to the BTS
Remotely in Telnet Mode
Performing the BSS
Reverse Maintenance
Location Update Test
BTS Coverage Test
MS Call Test
Handoff Test
Short Message Service
Test
Mobile-Originated Packet
Data Call Test
Mobile-Terminated Packet
Data Call Test
Querying Basic Information of the
BTS
Querying BTS Board Version
Verifying the Software Version
Querying Availability of BTS Cells
Active Alarms of the BTS Querying
Verifying the Consistency Between
the BTS and the Configuration
Data of the BSC Interface
Querying the Status of the BTS
Links
Forward Power Test
Reverse RSSI Test
Loading the BTS Software
Locally
Loading the BTS Software
Remotely
Querying the Configuration Data of
the BTS