14
LP-185 Rev. 9.9.14
Table 1
– Specifications
Before considering location, many factors need to be addressed. Piping, Venting, and Condensation Removal are just a few of the
issues that need attention prior to the installation of the boiler. Please read the entire manual, as it could save time and money.
B. LEVELING
Figure 3
– Boiler Leveling
In order for the condensate to properly flow out of the collection system, the boiler must be installed
with 1/8” per foot pitch toward the
back. The location must also support the boiler when it is full of water. The boiler comes equipped with leveling feet. Should the floor
beneath the boiler be uneven, use a wrench to adjust the feet so the boiler is pitched back at 1/8” per foot.
Содержание 140M
Страница 12: ...12 LP 185 Rev 9 9 14 Figure 1 Dimensions T 50M T 80M 80M ...
Страница 13: ...13 LP 185 Rev 9 9 14 Figure 2 Dimensions 140M 199M 399M ...
Страница 48: ...48 LP 185 Rev 9 9 14 I DIAGRAMS FOR SIDEWALL VENTING Figure 25 Venting ...
Страница 49: ...49 LP 185 Rev 9 9 14 Figure 26 Sidewall Venting ...
Страница 50: ...50 LP 185 Rev 9 9 14 J DIAGRAMS FOR VERTICAL VENTING Figure 27 Vertical Venting ...
Страница 55: ...55 LP 185 Rev 9 9 14 Figure 29 ...
Страница 70: ...70 LP 185 Rev 9 9 14 Figure 31 ...
Страница 71: ...71 LP 185 Rev 9 9 14 Figure 32 ...
Страница 72: ...72 LP 185 Rev 9 9 14 Figure 33 ...
Страница 73: ...73 LP 185 Rev 9 9 14 Figure 34 ...
Страница 74: ...74 LP 185 Rev 9 9 14 Figure 35 ...
Страница 75: ...75 LP 185 Rev 9 9 14 Figure 36 ...
Страница 78: ...78 LP 185 Rev 9 9 14 ...
Страница 79: ...79 LP 185 Rev 9 9 14 ...
Страница 80: ...80 LP 185 Rev 9 9 14 MAINTENANCE NOTES ...