HSM powerline hds 230 Скачать руководство пользователя страница 8

8  

 

Powerline HDS 230

 01/2014

HDS 230

Checking the 

fl

 ap switch

• Open 

the 

fl

 ap.

 

 The indicator “Flap open” must light up.



The cutting block and conveyor must stop.

After you close the 

fl

 ap, the display should 

go out and you can start the machine again 
by pressing the start button.

Inspecting the safety devices

Check that the safety devices 
are working properly:
• At the start of each shift
• After any maintenance or repair work

Do not start the machine until you have checked the safe-
ty devices and found them to be in perfect working order. 
If any defect arises during operation stop the machine 
immediately and make sure it is corrected.

7 Start-up

Switching on the hard drive shredder

•  Unlock the emergency stop button 

by turning it anticlockwise.

•  Turn the main switch to the 

I

 position.

Caution!

  The feed belt can run in reverse if the 

phase wires in the power plug are incor-
rectly connected.
Turn off the main switch immediately 
and pull out the power plug! 
Have an electrician change two of the 
three phase wires.

 The green “Ready for operation” 

LED lights up.

Note:

If the “Ready for operation” display 

fl

 ashes, 

the machine can only be switched on when 
the display has stopped 

fl

 ashing and lights 

up continuously.

•  Press the start button.

 The cutting block and conveyor start up.

Checking the emergency stop button

Press the emergency stop button 
while the machine is running. 
The shredder must switch off im-
mediately. The cutting block and the 
conveyor must stop.
The machine will only start again once 
you have pulled out the emergency 
stop button again.

Содержание powerline hds 230

Страница 1: ...OPERATING MANUAL HARD DRIVE SHREDDER 1 777 999 110 C 01 2014 HDS 230 Powerline HDS 230 english ...

Страница 2: ...ranty 3 2 Safety instructions 3 3 Overview 4 4 Dimensions 5 5 Transportation installation 6 6 Operating and display elements 7 7 Start up 8 8 Malfunctions 9 9 Cleaning 11 10 Service 11 11 Disposal Recycling 13 12 Technical data 14 EC declaration of conformity 15 ...

Страница 3: ...ton immediately This switches off the shredder and stops the cutting block and exit con veyor Main switch In the event of danger turn the main switch to 0 You can secure the main switch in this position with a padlock to prevent restarting 2 Safety instructions Before using the machine for the first time read the operating manual and keep it for later use Observe all safety instructions attached t...

Страница 4: ...4 Powerline HDS 230 01 2014 HDS 230 1 Main switch 2 Emergency stop button 3 Operating and display elements 4 Loading tray 5 Slider 6 Flap 7 Braking swivel castors 8 Conveyor 1 7 8 4 3 2 5 6 3 Overview ...

Страница 5: ...01 2014 Powerline HDS 230 5 HDS 230 4 Dimensions XVZXUIK KH HMHFWLRQ KHLJKW Machines with cut size 20 x 30 50 mm Machines with cut size 11 5 x 26 mm ...

Страница 6: ...ne in such a way that the power plug is easily accessible and the ventilation slots are free The machine must be connected to a power source which meets the specifications on the nameplate Make sure the power cable is unobstructed and that nobody can tread on it Connect the power plug of the machine into a properly installed socket Lock the front castors by pressing down the brake lever Push the c...

Страница 7: ... off start Indicator Overload level 2 Display with no function Indicator ready for operation Indicator Flap open or emergency stop was pressed Indicator Level 1 overload Indicator Jam conveyor R button Cutting unit runs in reverse 6 Operating and display elements ...

Страница 8: ... shredder Unlock the emergency stop button by turning it anticlockwise Turn the main switch to the I position Caution The feed belt can run in reverse if the phase wires in the power plug are incor rectly connected Turn off the main switch immediately and pull out the power plug Have an electrician change two of the three phase wires The green Ready for operation LED lights up Note If the Ready fo...

Страница 9: ...ched on Is the flap closed Is there a jam in the shredder Has the motor been overloaded Overload due to jam Overload display level 1 or level 2 de pending on the machine model lights up The cutting block automatically runs in reverse for several seconds Then the cutting unit switches off Caution The blade rollers can still cause injuries even while they are not running Do not reach into the cuttin...

Страница 10: ...onveyor belt slips and has to be re tensioned Switch the shredder off Turn the main switch to 0 Pull the conveyor belt out of the machine and loosen the hex nuts 1 on the bearing flange 2 on the left hand and right hand sides as well as the hex head screws 3 Electric motor overheated Overload display level 1 or level 2 or conveyor depending on the machine model flashes The shredder switches off au...

Страница 11: ...se K2K in accordance with DIN 51502 DIN 51825 9 Cleaning F E T T G R E A S E G R A S O G R A I S S E V E T F E T T G R E A S E G R A S O G R A I S S E V E T Remove the inspection flap 1 in the left hand side plate To do this remove the covers and take out the screws M 6X12 2 1 2 WARNING Maintenance and service tasks may only be performed by HSM customer service and service engineers of our dealers...

Страница 12: ...he chain tension To do this unscrew the 4 screws M 20 x 80 4 pieces so that the motor can slip down the slope until the chain sag returns to 9 14 mm If the gap in the elongated hole is larger than 5 mm the next slot nut up in length must be used For the 1st unit we have provided you with three longer slot nuts which are in a bag on the gear motor If the chain is so elongated that the slot nuts are...

Страница 13: ...μ 0 125 Property class Property class 8 1 14 34 67 115 185 400 290 560 970 1450 1950 9 5 2 8 4 1 4 8 8 8 10 9 12 9 16 40 79 135 220 470 340 660 M 22 540 760 890 1150 1700 2300 Screw connections Interval 1000 working hours Dispose of the machine in an environmentally sound way at the end of its service life Observe the current regula tions when doing this As legislation is subject to ongoing change...

Страница 14: ...ring and operation Temperature Relative humidity Height above sea level MSL 10 C to 25 C max 90 without condensation max 2 000 m Cut size mm 20 x 40 50 Power consumption Power supply Nominal current Safety fuse 3 2 kW 3 x 400 V 50 Hz 7 3 A 16 A GG GL C K 3 2 kW 3 x 380 V 60 Hz 7 A 16 A GG GL C K 3 2 kW 3 x 220 V 50 Hz 12 7 A 32 A GG GL C K 5 5 kW 3 x 208 V 60 Hz 11 A 30 A GG GL C K Cut size mm 11 ...

Страница 15: ... to its conception and design of the version in which it was put into circulation by us Machinery directive 2006 42 EC EMC directive 2004 108 EC Applied standards and technical specifications EN 349 EN 953 EN 1037 EN 1088 EN ISO 12100 EN 13849 1 EN ISO 13850 EN ISO 13857 EN 60204 1 EN 61000 3 2 EN 61000 3 3 EN 61000 6 2 EN 61000 6 4 EN 62061 Authorised representative for the compilation of technic...

Страница 16: ...ave n 15 El Lago Pol Ind Monguit 08480 L Ametlla del Vallès Barcelona Tel 34 93 8617187 Fax 34 93 8463417 Spain hsm eu http es hsm eu HSM France SAS Parc de Genève 240 Rue Ferdinand Perrier 69800 Saint Priest Tél 33 472 210580 Fax 33 472 517481 France hsm eu http fr hsm eu HSM of America LLC 419 Boot Road Downingtown PA 19335 Tel 1 484 237 2308 1 800 613 2110 Fax 1 484 237 2309 customerservice hsm...

Отзывы: