
distributed by
Assembly and alignment
FM 239 MuW Beta-Typ-Z Rev.01
2018-06-19
13
6.2
Screwing linear unit into place from underneath
Figure 3: Sliding blocks (1) in the slot on the underside of the basic profile
Secure the linear unit using fastening screws from below using the
sliding blocks or the threaded rails in the basic aluminium profile
(Figure 3).
Proceed as follows
1.
Align the linear unit.
2.
Align the sliding blocks (1) / threaded rails.
3.
Screw the linear unit into place
(for tightening torques refer to Section 3).
Содержание Beta 110-ZSE
Страница 2: ......