61
switch on 19-inch rack,
IRF fabric
configuring basic settings,
connecting member switches in a ToR
solution,
connecting member switches in one rack,
connecting physical ports,
identifying master switch,
identifying member switch physical ports,
planning,
planning cabling scheme,
,
planning connections,
planning installation site,
planning member IDs,
planning topology,
setting up,
verify the IRF fabric setup,
L
LED
10/100/1000 Base-T Ethernet port,
100/1000Base-X SFP port,
power supply status,
RPS status,
SFP+ port,
technical specifications,
M
maintenance
master switch
configuring IRF basic settings,
IRF fabric,
member
configuring IRF member switch basic
settings,
connecting IRF physical ports,
identifying IRF member switch physical
ports,
mounting
workbench mounting switch,
N
network management
setting up IRF fabric,
troubleshooting configuration terminal
problems,
troubleshooting the switch,
networking
planning IRF cabling scheme,
no terminal display (troubleshooting),
P
parity (parameter),
PE wire,
physical port
connecting,
identifying IRF member switch physical ports,
planning
IRF cabling scheme,
IRF connections,
port
100/1000Base-X SFP,
connecting IRF physical ports,
identifying IRF member switch physical ports,
LED (100/1000Base-X SFP),
LED (SFP+),
setting up IRF fabric,
SFP+,
technical specifications,
port mode
LED,
power supply
cable,
connecting AC power source,
connecting RPS,
grounding switch through AC power supply PE
wire,
LED,
removal,
,
powering on switch,
preparing for installation,
preventing
procedure
configuring IRF basic settings,
connecting AC power source,
connecting IRF physical ports,
connecting power cord,
connecting RPS,
grounding switch through AC power supply PE
wire,