63
technical specifications,
troubleshooting,
troubleshooting the switch,
verifying 19-inch rack installation,
workbench mounting switch,
system administration
troubleshooting configuration terminal
problems,
troubleshooting fixed power supply failure,
troubleshooting hot-swappable power supply
failure,
system status LED,
T
technical specifications,
10/100/1000 Base-T Ethernet port,
10/100/1000 Base-T Ethernet port LED,
100/1000Base-X SFP LED,
100/1000Base-X SFP port,
combo interface,
console port,
LED,
port mode LED,
power supply status LED,
RPS status LED,
SFP+ port,
SFP+ port LED,
system status LED,
temperature
installation site requirements,
terminal
troubleshooting garbled terminal display,
troubleshooting no terminal display,
tools needed for installation,
topology
planning IRF cabling scheme,
topology (IRF fabric),
troubleshooting
configuration terminal problems,
fixed power supply failure,
garbled terminal display,
hot-swappable power supply failure,
no terminal display,
V
verify the IRF fabric setup,
verifying
IRF fabric setup,
switch installation (19-inch rack),
W
workbench
mounting switch,