This document is for the person who installs racks and rack products. This procedure is
performed only by trained personnel. Hewlett Packard Enterprise assumes you are qualified in
performing installations and trained in recognizing hazards in rack products.

Содержание ARCS 42U

Страница 1: ...er 2018 Edition 1 Abstract This document is for the person who installs racks and rack products This procedure is performed only by trained personnel Hewlett Packard Enterprise assumes you are qualifi...

Страница 2: ...e from Hewlett Packard Enterprise required for possession use or copying Consistent with FAR 12 211 and 12 212 Commercial Computer Software Computer Software Documentation and Technical Data for Comme...

Страница 3: ...s 29 Configuring the unit 34 Installing the option kits 36 Installing the side panel blanks on the IT racks 36 Installing side panel blanks on a 42U IT rack 36 Installing side panel blanks on a 48U IT...

Страница 4: ...ation 70 Obtaining replaceable parts 70 Maintenance and service 70 Air and water heat exchanger maintenance 70 Water quality and leveling requirements and condensation management 71 Acceptable water q...

Страница 5: ...cooled air is then returned to the inlet of the servers The HPE Adaptive Rack Cooling System is offered in four configurations using either HPE ARCS 42U 600x1600mm Racks or HPE ARCS 48U 600x1600mm Rac...

Страница 6: ...1 HPE Adaptive Rack Cooling System 2 HPE ARCS 48U 600x1600mm Rack HPE Adaptive Rack Cooling System two HPE ARCS 42U 48U 600x1600 Racks Air flow for HPE Adaptive Rack Cooling System dual rack configur...

Страница 7: ...HPE Adaptive Rack Cooling System 2 HPE ARCS 48U 600x1600mm Rack HPE Adaptive Rack Cooling System three HPE ARCS 42U 48U 600x1600mm Racks Air flow for HPE Adaptive Rack Cooling System three rack config...

Страница 8: ...HPE Adaptive Rack Cooling System 2 HPE ARCS 48U 600x1600mm Rack HPE Adaptive Rack Cooling System four HPE ARCS 42U 48U 600x1600mm Racks Air flow for HPE Adaptive Rack Cooling System four rack configu...

Страница 9: ...he IT equipment The HPE Adaptive Rack Cooling System and rack extensions channel warmed air from the rear of the IT equipment into the side mounted or center mounted HPE Adaptive Rack Cooling System c...

Страница 10: ...Item Description 1 HPE Adaptive Rack Cooling System with 6U facade 2 HPE ARCS 48U 600x1600mm Rack 10 Overview...

Страница 11: ...hot aisle air plenum Hot air from the IT exhaust is pulled through the HPE Adaptive Rack Cooling System cooled with the heat exchanger connected to facility water and the cooled air is then returned...

Страница 12: ...Item Description 1 CMC management module 2 Transfer switch Unit Rear View Item Description 1 Water supply 2 Water return 12 HPE Adaptive Rack Cooling System introduction...

Страница 13: ...e Rack Cooling System component identification Control Valve Item Reference 1 Electrical connector 2 Actuator assembly 3 Valve position indicator Isolation Valves HPE Adaptive Rack Cooling System intr...

Страница 14: ...5 Valve status connector Connectors Item Reference 1 AC power in 2 Fan power connectors 3 Valve connectors 4 Rear air pressure connectors 5 CAN bus connection 6 Ethernet connection 7 10 Sensors 11 ARP...

Страница 15: ...System is rated at a maximum facility pressure of 8 bar 116 PSI If valves are installed on the external pipe work that could potentially trap fluid inside the HPE Adaptive Rack Cooling System special...

Страница 16: ...Hewlett Packard Enterprise authorized reseller Listed materials are subject to change Accessory Kits HPE ARCS Accessory Kit The HPE ARCS Accessory Kit comes with the HPE Adaptive Rack Cooling System...

Страница 17: ...d on both ends Aluminum end cap 1 8 diameter Barbed threaded NPTF hose end 1 8 diameter Pipe clamp galvanized 3 8 ID X 9 16 long for HPE Adaptive Rack Cooling System Pipe clamp galvanized 3 8 ID X 11...

Страница 18: ...p Kit Hewlett Packard Enterprise recommends using the HPE Adaptive Rack Cooling SystemWater Hook Up Kit to connect the HPE Adaptive Rack Cooling System to a facility water supply Each kit includes two...

Страница 19: ...panel blank for the rear extension 4 3 Rack side panel blank 24 4 Side panel blank for the front extension Panel B 10 5 Side panel blank for the front extension Panel D 2 6 Side panel sealing tape 7...

Страница 20: ...e panel blank for the front extension Panel C 4 4 Side panel blank for the front extension Panel A 4 5 Screw 6 32 3 8 long 80 6 Grounding screw 1 7 Screw 5 5 X1 81X10 Pan Torx T25 3 8 Facade 6U 1 9 Le...

Страница 21: ...21 10 1 2 Front door latch assembly with bracket 1 3 Rear door latch assembly 2 4 Auto door cable harness assembly 1 5 Screws rear lock mount 8 6 Screws 1 4 20 button head 2 7 Screws M5 5X10 Torx pan...

Страница 22: ...0 Torx pan head tap 2 4 Custom mounting bracket 1 5 Zip ties 50 6 C13 14 power cord 12 ft 1 7 CanBus cable 5 meters 1 8 HPE Adaptive Rack Cooling System IO Module cable 1 Required tools The following...

Страница 23: ...on 2 Using four or more people and the ramps that came with the HPE ARCS 42U 48U 600x1600mm Rack remove the HPE Adaptive Rack Cooling System from the pallet 3 Roll the HPE Adaptive Rack Cooling System...

Страница 24: ...ing System 7 Plug the other end of the network cable into the facility network connection outlet WARNING Before connecting the power cords to a power source be sure that the unit is properly grounded...

Страница 25: ...ding plug The grounding plug is an important safety feature Plug the power cord into a grounded earthed electrical outlet that is easily accessible at all times To disconnect power to the equipment un...

Страница 26: ...k settings accessing controls reviewing the details on the info page and resetting to factory defaults see the HPE Adaptive Rack Cooling System Web Interface Guide Baying the racks together Use the fo...

Страница 27: ...arate high and low pressure apply one central vertical strip of foam gasket On HPE ARCS 42U 600x1600mm Racks 1 If the HPE Adaptive Rack Cooling System is on the end of a row to seal around the panels...

Страница 28: ...s indicated 2 If the HPE Adaptive Rack Cooling System is bayed to an adjacent rack apply the foam gasket in the corners of the frame 3 If the HPE Adaptive Rack Cooling System is bayed to an adjacent r...

Страница 29: ...nce pickup in the rear of the HPE Adaptive Rack Cooling System to the measurement ports on the rear of the HPE Adaptive Rack Cooling System There are two ports in the front and two ports in the rear o...

Страница 30: ...for that HPE Adaptive Rack Cooling System with a tee and route it to the farthest IT rack on the side of the HPE Adaptive Rack Cooling System that is cooled by that HPE Adaptive Rack Cooling System u...

Страница 31: ...in hose barbs together and install them only on the farthest rack from the HPE Adaptive Rack Cooling System left rack in this illustration Purchase an extra Y connection for this installation 2 Instal...

Страница 32: ...or IT clearance on installation Position port holes horizontally with one side facing the IT rack and the other side facing the extension 3 Connect the HPE Adaptive Rack Cooling System to the pickups...

Страница 33: ...he port on the HPE Adaptive Rack Cooling System and the final connection in the IT rack 5 Mount the rear HPE Adaptive Rack Cooling System pressure pickup tube with the hose barb facing right 6 On the...

Страница 34: ...up Access and change the HPE Adaptive Rack Cooling System Ethernet settings using any of the following methods DHCP Factory default IP address and the web interface Serial console interface on the CMC...

Страница 35: ...of static IP address The HTTP menu enables or disables the web interface and HTTP HTTPS selection Console settings allow disabling or enabling of SSH and Telnet console access The Users menu under Sec...

Страница 36: ...Port Auto 8 System Name HPE Adaptive Rack Cooling System 9 System Contact Your administrator A System Location Room 123 Building ABC B Actual Date 26 02 1970 C Actual Time 20 08 41 D Beeper Disabled E...

Страница 37: ...blanks for the front extension 5 10 Panel B side panel blanks for the front extension For more information on the HPE ARCS 42U Air Rack Installation Kit contents see Accessory and option kit contents...

Страница 38: ...in the previous illustration 1 From the inside of the HPE Adaptive Rack Cooling System place the blank against the IT rack and line up the screw holes 2 Install three screws to hold the blank in place...

Страница 39: ...ank Installing side panel blanks on a 48U IT rack The HPE ARCS 48U Air Rack Installation Kit is for 48U racks and includes the following side panel blanks Item Description 1 8 rack side panel blanks 2...

Страница 40: ...blanks 1 Place the blank against the IT rack and line up the screw holes 2 Install four screws to hold the blank in place 3 Repeat steps 1 and 2 for each additional front extension side panel blank T...

Страница 41: ...al top 6U blank Installing the HPE ARCS Auto Door Release Kit and HPE ARCS Auto Door Controller Kit To allow the HPE Adaptive Rack Cooling System doors to automatically open when customer defined temp...

Страница 42: ...Release and Controller Kits 1 Remove the existing striker plate from the front door 2 Align the new striker assembly with the large reference whole on the front extension Then use the set of three M5...

Страница 43: ...h the hole and connect it to the rear door latch assembly Align the rear door latch assembly with the screw holes Use four rear lock mount screws to install the rear door latch assemblies To prevent e...

Страница 44: ...to install the rear door latch assemblies To prevent electrostatic discharge damage when the door is opened apply the tape provided in the HPE ARCS 42U Air Rack Installation Kit to the cable connectio...

Страница 45: ...e mounting bracket Then use four screws to install the power supply 9 Align the CMC III I O ARCS Rack Module with the screw holes on the mounting bracket underneath the power supply Then use four scre...

Страница 46: ...CS Auto Controller Kit to the CMC and then route the cable as shown Connect the other end to the I O module 11 To connect the power supply to the power source connect the power cord part number 142263...

Страница 47: ...ontroller cable bundle to the I O module as labeled on the harness Item Description 1 HPE Adaptive Rack Cooling System 2 Harness coming from IT rack part number P06225 001 3 Power supply 4 I O module...

Страница 48: ...the top of the IT rack door and down to the door latch assembly c Route the cable across the top of the IT rack and to the upper door latch assembly d Route the cable along the right rear of the rack...

Страница 49: ...Facade is for purely aesthetic purposes The 6U Facade comes with the HPE Apollo Air 48U Rack Installation Kit For more information on the kit contents see Accessory and option kit contents To install...

Страница 50: ...ts to the 6U facade use the four screws included with the kit 3 Place the 6U Facade on top of the HPE Adaptive Rack Cooling System lining up the screw holes Use the screws you set aside in step 1 to s...

Страница 51: ...y by customer requirements NOTE The HPE Adaptive Rack Cooling System has a failed last control state valve During initial hookup the control valve must be manually opened through the web interface to...

Страница 52: ...nsate pump outlet hoses to an appropriate facility drainage system a Install any necessary extensions and route the condensate pump outlet line and gravity drain tubing to a facility drainage point b...

Страница 53: ...cabinet All hoses must be routed to a floor drain or reclamation system The two overflow hoses are located in the HPE ARCS Accessory Kit 3 To minimize strain on connections and to minimize operationa...

Страница 54: ...6 Select the Device Settings button on the System Control group 7 Change System Control Fans Control Mode to Manual and System Control Valves Control Mode to Manual 54 Installation...

Страница 55: ...8 Change System Control Valves Manual Facility 0 100 to 100 and click Write 9 Return to the Visualization screen on the System menu Installation 55...

Страница 56: ...n instead of manual 12 If there are any manual valves on the facility lines be sure that they are open 13 If necessary use the bleeder tool from the accessory kit to open the bleeder valve and remove...

Страница 57: ...The installation is complete Installation 57...

Страница 58: ...d in the appropriate web interface menu it is also activated and an audible alarm is signaled by the internal beeper The management module performs regulation operations such as Retrieving all sensor...

Страница 59: ...reen the management module has power and conditions are normal If the LED is green and flashing communication is taking place If the LED is yellow a warning has been issued If the LED is red a critica...

Страница 60: ...management module see the HPE Adaptive Rack Cooling System Web Interface User Guide 3 Log in through the terminal emulation program Logging in through the terminal emulation program Procedure 1 Enter...

Страница 61: ...he credentials click Clear Only one Admin session and one User session are supported at a time If a second session is initiated after successful login or a console session timeout occurs sessions can...

Страница 62: ...Operator display components The operator display on the front door of the HPE Adaptive Rack Cooling System unit has a digital touch screen To scroll through the menu options press the appropriate but...

Страница 63: ...rface such as CMCIII PU N 0X N is the CAN Bus number where the alarming device resides 0X is the component parameter in the subtree Subtree component name Component under the target device that caused...

Страница 64: ...r flow and air flow to maintain IT inlet temperature set points and supply the proper volume of air required by the system IT heat is removed to the facility water loop How is water connected to the H...

Страница 65: ...ve Rack Cooling System contains overflow switches that shut off the HPE Adaptive Rack Cooling System isolation valves stopping facility flow and triggering an alarm What will happen if water stops flo...

Страница 66: ...r more information see Cooling performance parameters in the HPE Adaptive Rack Cooling System Web Interface User Guide The average exhaust temperature air coming out of the servers is too high For mor...

Страница 67: ...m shipping depth on skid 182 9 cm 72 0 in Net weight 645 kg 1 423 lb Shipping Weight gross with packaging 732 kg 1 614 lb Electrical specifications Item Specification Input voltage range 380 480V 3ph...

Страница 68: ...000 CFM 16 990 m3 h With 3 or 4 fans 7 500 CFM 12 743 m3 h Operating 150 kW maximum Performance is dependent on water temperature and air temperature set point Chilled water flow rate 270 l min 71 3 U...

Страница 69: ...ons HPE ARCS 42U 600x1600mm Rack U Height Width Depth Weight Empty 42U 2 004 mm 78 9 in 600 mm 23 6 in 1 600 mm with extensions 63 0 in 158 76 kg 350 lb HPE ARCS 48U 600x1600mm Rack U Height Width Dep...

Страница 70: ...als 6 From the Quick jump to manuals section select Service and maintenance information Maintenance and service For information on maintenance and service see the Hewlett Packard Enterprise website ht...

Страница 71: ...disruption in service The water flowing into the HPE Adaptive Rack Cooling System must meet the guidelines stated in this guide Damage caused by contaminated water is not covered by the HPE Adaptive...

Страница 72: ...nts Brass components with high levels of zinc Leveling requirements Use the leveling feet to adjust the height of the individual racks to match neighboring racks Use the leveling pads for weight distr...

Страница 73: ...brary www hpe com info EIL Single Point of Connectivity Knowledge SPOCK Storage compatibility matrix www hpe com storage spock Storage white papers and analyst reports www hpe com storage whitepapers...

Страница 74: ...mponents Accessing updates Some software products provide a mechanism for accessing software updates through the product interface Review your product documentation to identify the recommended softwar...

Страница 75: ...ett Packard Enterprise strongly recommends that you register your device for remote support If your product includes additional remote support details use search to locate that information Remote supp...

Страница 76: ...ormation report for this product can be found at www hpe com info reach For Hewlett Packard Enterprise product environmental and safety information and compliance data including RoHS and REACH see www...