2.
To attach the left and right mounting brackets to the 6U facade, use the four screws included with the
kit.
3.
Place the 6U Facade on top of the HPE Adaptive Rack Cooling System, lining up the screw holes. Use
the screws you set aside in step 1 to screw the 6U Facade into place.
50
Installation