Removing a hard disk drive from the slot load optical bay
1.
Disconnect power from the workstation (see
Predisassembly procedures on page 74
).
2.
Remove the side access panel (see
Removing the side access panel on page 76
).
3.
Remove the airflow guide (see
Removing the airflow guide on page 77
).
4.
Remove the expansion card support and any card cables that might interfere with slot load
assembly removal.
5.
Disconnect the optical drive power cable from the chassis power cable, and the optical drive data
cable from the system board (see
Removing the slot load optical disk drive on page 100
).
6.
Disconnect the slot load drive data cable from the system board connector as shown in the following
figure.
Figure 5-45
Disconnecting the data cable from the system board
7.
Disconnect the chassis power cable from the slot load drive power connector as shown in the
following figure.
Figure 5-46
Disconnecting chassis power cable from hard disk drive connector
112 Chapter 5 Replacing components
ENWW
Содержание Z800 - Workstation - 6 GB RAM
Страница 1: ...HP 800 Workstation Maintenance and Service Guide ...
Страница 4: ...iv About this guide ENWW ...