
Servicing & Upgrading 137
Servici
ng & Upgradi
ng
1
Backup any data on the array that you wish to keep. You may also want to
record the LUN structure on the array. You will need to recreate it after
formatting the array.
2
Perform the steps in
"Upgrading Array Controller DIMMs" on page 135
,
removing or replacing DIMMs as required. The cache must be reduced on
both controllers.. After powering on the array, continue with the following
steps.
3
Check the status of the array. It should indicate No Maps.
4
Format the array using CommandView SDM or the VFP.
5
Recreate the original LUN structure on the array.
6
Reload any backed up data.
Upgrading Array Controller Firmware
(HP Service Personnel Only)
Caution
To prevent data loss, it is recommended that a full backup be
performed before starting this procedure.
Note
When downloading controller firmware, always check the
README file included with the firmware. (If you have access,
you can also read the HP Service Note associated with the
firmware download.) This information will identify whether you
can perform the firmware download offline or online.
1
Download new firmware to an active array controller using
CommandView SDM. See “Upgrading Array Controller Firmware” in the
on-line Help.
The download process copies the new firmware to the other array controller
automatically.
Note
When firmware microcode is fully downloaded, the array
controller suspends I/Os for about 10 seconds, then switches to
the new code.
Upgrading Link Controller Card Firmware
(HP Service Personnel Only)
Caution
To prevent data loss, it is recommended that a full backup be
performed before starting this procedure.
Содержание StorageWorks 7110 - Virtual Array
Страница 12: ...12 Contents ...
Страница 54: ...54 Product Overview Figure 21 VA 7110 I O Architecture ...
Страница 90: ...90 Troubleshooting ...
Страница 113: ...Servicing Upgrading 113 Servicing Upgrading Figure 43 Removing Installing a VA 7100 Controller 1 2 3 4 ...
Страница 114: ...114 Servicing Upgrading Figure 44 Removing Installing a VA 7110 7400 7410 Array Controller 1 2 3 ...
Страница 116: ...116 Servicing Upgrading Figure 45 Removing Installing an Array Controller Filler Panel 1 2 3 ...
Страница 119: ...Servicing Upgrading 119 Servicing Upgrading Figure 47 Connecting an Array Controller Battery 1 3 4 5 2 ...
Страница 124: ...124 Servicing Upgrading Figure 49 Removing Installing a Midplane Assembly 2 1 4 5 8 7 9 10 6 3 ...
Страница 129: ...Servicing Upgrading 129 Servicing Upgrading Figure 52 Removing and Installing an LCC 1 2 3 ...
Страница 130: ...130 Servicing Upgrading Figure 53 Setting the FC Loop Speed Switch Must be set to 1GB s ...
Страница 149: ...Specifications Regulatory Statements 149 Specifications Regulatory Statements ...
Страница 151: ...Specifications Regulatory Statements 151 Specifications Regulatory Statements ...
Страница 152: ...152 Specifications Regulatory Statements ...
Страница 164: ...164 Index ...