
Setup 17
Two types of interconnect modules are available for HP BladeSystem c-Class enclosures: Pass-Thru
modules and switch modules. For more information about interconnect module options, see the HP
website (
http://www.hp.com/go/bladesystem/interconnects
).
IMPORTANT:
To connect to a network with a Pass-Thru module, always connect the Pass-Thru
module to a network device that supports Gigabit speed.
Installing a server blade
CAUTION:
To prevent improper cooling and thermal damage, do not operate the workstation
blade or the enclosure unless all hard drive and device bays are populated with either a
component or a blank.
1.
Remove the device bay blank.
2.
Remove the enclosure connector cover.
Содержание ProLiant WS460c G6 Workstation Blade
Страница 15: ...Operations 15 4 Remove the DIMM baffle ...
Страница 18: ...Setup 18 3 Prepare the workstation blade for installation 4 Install the workstation blade ...
Страница 93: ...Technical support 93 ...
Страница 94: ...Technical support 94 ...
Страница 97: ...Acronyms and abbreviations 97 VCA Version Control Agent VCRM Version Control Repository Manager ...