Hardware options installation 22
5.
Install the hard drive.
6.
Close the bezel.
7.
Resume normal server operations.
8.
Determine the status of the hard drive from the hot-plug SAS hard drive LED combinations ("
SAS and
SATA hard drive LED combinations
" on page
60
).
Hard drive LED cable option
This section provides the following procedures:
•
Installing the LED cable (ML110 G4) (on page
23
)
•
Installing the LED cable (ML150 G3) (on page
26
)
•
Installing the LED cable (ML110 G5, ML115 G5, and ML150 G5) (on page
28
)
Содержание ProLiant ML110 - G2 Server
Страница 20: ...Hardware options installation 20 3 Remove the hard drive blank ...
Страница 21: ...Hardware options installation 21 4 Prepare the hard drive ...
Страница 112: ...Technical support 112 ...
Страница 113: ...Technical support 113 ...
Страница 117: ...Acronyms and abbreviations 117 VGA video graphics array ...