Removal and replacement procedures 27
To access the front panel components, unlock and then remove the security bezel.
Power down the server
Before powering down the server for any upgrade or maintenance procedures, perform a backup of
critical server data and programs.
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the equipment,
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some
internal circuitry remain active until AC/DC power is removed.
IMPORTANT:
When the server is in standby mode, auxiliary power is still being provided to
the system.
To power down the server, use one of the following methods:
•
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters
standby mode.
•
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the
OS. If an application stops responding, you can use this method to force a shutdown.
•
Use a virtual power button selection through iLO 4.
This method initiates a controlled remote shutdown of applications and the OS before the server
enters standby mode.
Before proceeding, verify the server is in standby mode by observing that the system power LED is
amber.
Extend the server from the rack
To extend the server from a Hewlett Packard Enterprise, Compaq-branded, Telco, or third-party rack:
Содержание ProLiant DL60 Gen9
Страница 5: ...Contents 5 Documentation feedback 111 Index 112 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 23: ...Illustrated parts catalog 23 ...
Страница 33: ...Removal and replacement procedures 33 o Secondary PCI riser cage o PCI blank ...
Страница 95: ...Component identification 95 Fan locations ...
Страница 100: ...Cabling 100 FBWC module slot 3 cabling M 2 SSD cabling Slot 2 cable routing 2 ports supported when slot 1 is unoccupied ...
Страница 110: ...Acronyms and abbreviations 110 UID unit identification USB universal serial bus ...