Setting up and installing the GbE2 interconnect switch 22
1.
Insert the interconnect modules into the bottom-left and bottom-right module bays on the rear side of the server
blade enclosure.
IMPORTANT:
Be sure that the interconnect modules are fully seated. The latch/handle will drop into
place when the module is firmly seated.
Figure 12
Installing the QuadT2 or QuadSX Interconnect Modules
2.
Slide one GbE2 Interconnect Switch into the right interconnect bay in the front side of the server blade enclosure
(1). The GbE2 Interconnect Switch in the right interconnect bay is referred to as Switch B.
3.
Lock the ejector lever (2).
Figure 13
Installing the GbE2 Interconnect Switches
4.
Repeat steps 2 and 3 to insert the second GbE2 Interconnect Switch in the left interconnect bay. The GbE2
Interconnect Switch in the left interconnect bay is referred to as Switch A.
Replacing an existing GbE2 Interconnect Switch
CAUTION:
Removing a GbE2 Interconnect Switch from a powered enclosure
will
result in the loss of network
communications between the server blade network ports that are connected through this switch and the
segment of network infrastructure those ports need to communicate.
For continued blade server network communication and services availability, do the following before you
remove the GbE2 Interconnect Switch. Redirect critical high-availability services or applications to use the
redundant network ports available on those blade servers that are connected through the redundant GbE2
Interconnect Switch in the enclosure.