2-3
Installing the Series 8200zl Switch
Installation Procedures
Installing the Series 8200zl
Sw
it
ch
Installation Procedures
W A R N I N G
To avoid personal injury or product damage, read the safety warnings
on page 2-5 and installation precautions on page 2-6 and follow the
rack mounting guidelines on
page 2-9
. Due to product weight, two or
more persons are required to handle and mount the 8212zl.
Summary
Follow these easy steps to install your switch. The rest of this chapter provides
details on these steps.
1.
Prepare the installation site (
page 2-7
).
Make sure the physical
environment into which you will be installing the switch is properly
prepared including having the correct network cabling ready to connect
to the switch, and having a good location for the switch. See
page 2-6
for
some installation precautions.
2.
Mount the switch (
page 2-9
).
The Series 8200zl Switch is a large heavy
chassis, therefore ProCurve Networking recommends mounting the
empty chassis before populating it with modules or power supplies. It can
be mounted in a 19-inch telco rack, in an equipment cabinet, or on a
horizontal surface. An optional Rail Mounting Kit (5070-0145) is available
for mounting the Series 8200zl Switch in a cabinet suitable for shipping.
See the installation details for more information.
3.
Install switch modules (
page 2-14
).
The Series 8200zl Switch has 12
universal slots for installing any of the ProCurve Switch zl modules.
Depending on where you will install your Series 8200zl Switch, it may be
easier to install the modules first. The modules are “hot swappable”
though, so they can also be installed and removed after the switch is
powered on.
N o t e
Make sure you use only ProCurve Switch zl Modules in your Series 8200zl
Switch.
4.
Install power supplies (
page 2-17
).
The Series 8200zl Switch supports
up to four power supplies. It may be easier to install the power supplies
before mounting the switch. The switch must have at least one power
supply to operate.
Содержание ProCurve 8212zl Series
Страница 2: ......
Страница 3: ...ProCurve Series 8200zl Switch Installation and Getting Started Guide ...
Страница 10: ......
Страница 102: ......
Страница 118: ...C 6 Safety and Regulatory Statements Safety Information Japan Safety and Regulatory Statements Safety Information Japan ...
Страница 119: ...C 7 Safety and Regulatory Statements Safety Information China Safety and Regulatory Statements Safety Information China ...
Страница 122: ...C 10 Safety and Regulatory Statements EMC Regulatory Statements Safety and Regulatory Statements European Community ...
Страница 124: ......
Страница 136: ......
Страница 137: ......