31
PCB Version : 3.0
BootWare Validating...
Press Ctrl+B to enter extended boot menu...
Starting to get the main application file--flash0:/mainmsr201x.bin!.............
............................................................................
............................................................................
....
The main application file is self-decompressing.............................
.......
Done!
System application is starting...
User interface con0 is available.
Press ENTER to get started.
Press
Enter
and the system displays the following prompt:
<HP>
This prompt indicates that the router has entered user view and is ready to configure.
Power-on check
After powering on the router, check the following items:
1.
The LEDs on the front panel are normal.
The following table describes normal LED status after the router is powered on.
Table 5
Normal LED status after the router is powered on
LED Status
Meaning
PWR Steady
green
The power supply is working
properly.
SYS
Flashing green slowly
The system is working properly.
2.
The configuration terminal displays information correctly. You can see the startup window on the
local configuration terminal. For more information, see “
Startup process
.”
3.
After the power-on self-test (POST), the system prompts you to press
Enter
. When the command line
prompt appears, the router is ready to configure.
Configuring basic settings for the router
After the router is powered on for the first time, configure basic settings for the router. For more
information, see
HP MSR Router Series Fundamentals Configuration Guide
and
HP MSR Router Series
Fundamentals Command Reference
.