Procedure
1. Use the template on the front and rear of the rack frame to mark the attachment points for the sliding shelf rail assemblies,
by measuring from the top of the component installed below the desired position for the sliding shelf.
IMPORTANT: When using the template on the rear of the rack frame, mark the rack at the top of the template to
help align the next rack component.
2. Align and secure the rear of the left sliding shelf rail assembly to the rear of the rack frame with two M6 x 12 pan HD
screws and M6 external washers.
3. Secure the front of the left sliding shelf rail assembly to the front of the rack frame with two M6 x 12 pan HD screws and
M6 external washers.
100 Kilo Sliding Shelf kit
60
Содержание G2 Series
Страница 16: ...Ballast kit 16 ...
Страница 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Страница 26: ...Cable Management Combo kit 26 ...
Страница 29: ...Rack Roof Mount Fan kit 29 ...
Страница 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Страница 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Страница 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Страница 57: ...Server Utility Shelf kit 57 ...
Страница 65: ...Side Panel kit 65 ...
Страница 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...
Страница 74: ...800 mm rack Universal Rack Tie down kit 74 ...