NOTE: If the racks have a baying kit installed, remove the baying bracket before inserting the foam rail gasket. Follow steps
1 through 2 to install the foam rail gasket into a rack that will be bayed using a 24-in. baying bracket.
If the rack uses a 600-mm baying bracket, rotate the foam rail gasket 90 degrees before inserting it into the space between
the racks.
3. Gently push the foam rail gasket into the space between the racks until it is flush with the vertical frame.
CAUTION: The foam rail gasket must be installed into the rack before racks can be bayed together. For additional
information on baying racks, see the
Airflow Optimization kit
12
Содержание G2 Series
Страница 16: ...Ballast kit 16 ...
Страница 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Страница 26: ...Cable Management Combo kit 26 ...
Страница 29: ...Rack Roof Mount Fan kit 29 ...
Страница 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Страница 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Страница 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Страница 57: ...Server Utility Shelf kit 57 ...
Страница 65: ...Side Panel kit 65 ...
Страница 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...
Страница 74: ...800 mm rack Universal Rack Tie down kit 74 ...