NOTE: If you are connecting an HPE Advanced or Enterprise G2 series rack to a 10K G3, 11K G2, Intelligent, Advanced G1,
or Enterprise G1 rack, then you must also remove the side panels on the racks before baying them together.
2. Position the racks side by side, ensuring that the feet of the racks are on solid flooring (no cracks or openings).
3. Using two T-30 Torx screws in each bracket, attach two baying brackets (either 24-inch or 600-mm, depending on the
floor layout) to the front and rear of each rack set.
4. Bay any additional racks.
Baying kits
18
Содержание G2 Series
Страница 16: ...Ballast kit 16 ...
Страница 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Страница 26: ...Cable Management Combo kit 26 ...
Страница 29: ...Rack Roof Mount Fan kit 29 ...
Страница 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Страница 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Страница 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Страница 57: ...Server Utility Shelf kit 57 ...
Страница 65: ...Side Panel kit 65 ...
Страница 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...
Страница 74: ...800 mm rack Universal Rack Tie down kit 74 ...