![HP G2 Series Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/hp/g2-series/g2-series_installation-manual_161557033.webp)
4. Insert screws through the mounting rail into the cage nuts or clip nuts.
5. Tighten the hex nuts.
Warning: To reduce the risk of personal injury or damage to the equipment, be sure that:
WARNING: To reduce the risk of personal injury or damage to the equipment, be sure that:
• The rack has anti-tip measures in place. Such measures include floor-bolting, anti-tip feet, ballast, or a combination
as specified by the rack manufacturer and applicable codes.
• The leveling jacks (feet) are extended to the floor.
• The full weight of the rack rests on the leveling jacks (feet).
• The stabilizing feet are attached to the rack if it is a single-rack installation.
• The racks are coupled together in multiple rack installations.
Fixed rail kit
33
Содержание G2 Series
Страница 16: ...Ballast kit 16 ...
Страница 19: ...5 Re attach the front and rear doors Baying kits 19 ...
Страница 26: ...Cable Management Combo kit 26 ...
Страница 29: ...Rack Roof Mount Fan kit 29 ...
Страница 42: ...Hook and Loop Cabling Strap Clip kit 42 ...
Страница 43: ...Hook and Loop Cabling Strap Clip kit 43 ...
Страница 45: ...4 Bundle rack cables as required 1 4 Turn Hook and Loop Cabling Strap kit 45 ...
Страница 57: ...Server Utility Shelf kit 57 ...
Страница 65: ...Side Panel kit 65 ...
Страница 68: ...5 Tighten the bolts from steps 2 and 4 Stabilizer kit 68 ...
Страница 74: ...800 mm rack Universal Rack Tie down kit 74 ...