182
To examine the synchronization progress, use the
display device
and
display system internal ha
service-group
commands. The synchronization is completed if the following conditions are met:
•
All cards of the subordinate device are in normal state.
•
The
Action
field of the
display system internal ha service-group
command is 0 for each service.
Examples
# Deactivate the patch images in file
patch.bin
on the card in slot 10 of IRF member 1.
<Sysname> install deactivate patch flash:/patch.bin chassis 1 slot 10
Related commands
display install active
issu accept
Use
issu accept
to accept the upgrade.
Syntax
issu accept
Views
User view
Predefined user roles
network-admin
mdc-admin
Usage guidelines
You can execute the
issu commit
command to finish the ISSU process without executing this
command.
The automatic rollback timer is automatically deleted when you accept the upgrade.
Examples
# Accept the upgrade.
<Sysname> issu accept
Related commands
issu load
issu run switchover
issu commit
Use
issu commit
to complete an ISSU upgrade.
Syntax
issu commit chassis
chassis-number
Views
User view
Predefined user roles
network-admin