To execute the built-in performance verification test
Besides the powerup tests, there are additional performance verification tests
available. A list of these tests is available with the command "pv -l".
Most of these tests can be invoked from a terminal mode window in a
debugger interface or by telnetting to the probe. The LAN tests can only be
executed through the RS-232 port.
To perform the PV tests from a lan connection:
1
Disconnect the target cable from the target system, and attach the
terminator to the end of the target system cable.
2
To execute the all the tests one time type:
pv 1
(the lan tests will not be executed from a lan connection). The results will
appear on screen.
LAN Tests
The LAN tests can only be executed through the RS-232 port. The
remainder of this section assumes that the tests are being run from a terminal
emulator connected to the RS-232 port.
For the BREAK IN, TRIGGER OUT BNC FEEDBACK TEST, connect a
coaxial cable between BREAK IN and TRIGGER OUT
For the TARGET PROBE FEEDBACK TEST, replace target cable with
feedback connector E3490-61604
1
Set all of the switches to OPEN.
This is standard RS-232 at 9600 baud which can be connected directly to a 9
pin RS-232 interface that conforms to the IBM PC-AT 9 pin standard.
2
Use a terminal emulator to connect to the HP processor probe.
3
Enter the
pv
command.
Options available for the "pv" are explained in the help screen displayed by
typing "help pv" or "? pv" at the prompt. The help screen output will appear
similar to the screen shown on the following page:
Solving Problems
To execute the built-in performance verification test
86
Содержание E3494A
Страница 3: ...iii ...
Страница 4: ...iv ...
Страница 8: ...Contents viii ...
Страница 9: ...Part 1 Installation Installation 1 ...
Страница 10: ...Installation 2 ...
Страница 11: ...1 Connecting to the Host Computer Connecting to the Host Computer 3 ...
Страница 34: ...Connecting to the Host Computer To verify serial communications 26 ...
Страница 35: ...2 Connecting to the Target System Connecting to the Target System 27 ...
Страница 38: ...Connecting to the Target System To connect to a target system via the IEEE 1149 1 JTAG Port 30 ...
Страница 39: ...Part 2 Using the HP processor probe Using the HP processor probe 31 ...
Страница 40: ...Using the HP processor probe 32 ...
Страница 62: ...Configuring the HP Processor Probe for PowerPC 603 603e Processor Memory Cache Configuration Items 54 ...
Страница 63: ...Part 3 Reference Reference 55 ...
Страница 64: ...Reference 56 ...
Страница 65: ...4 Designing a Target System Designing a Target System 57 ...
Страница 72: ...Designing a Target System PowerPC 603 JTAG Interface Connections and Resistors 64 ...
Страница 73: ...5 Specifications and Characteristics Specifications and Characteristics 65 ...
Страница 77: ...6 Updating Firmware Updating Firmware 69 ...
Страница 83: ...7 Solving Problems Solving Problems 75 ...
Страница 102: ...Solving Problems To obtain replacement cables 94 ...
Страница 104: ...U Ultra target board 61 update firmware 70 USER light 77 V version firmware 73 W workstation files 25 Index 96 ...