Cabling and powering up the chassis 43
•
Dual-board option
Powering up the system
1.
Connect the power cables to the power supplies.
2.
Connect the power cables to the power source (UPS or wall outlet) or to an installed PDU.
3.
Press the Power On/Standby button on the server.
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the
server, see the Hewlett Packard Enterprise Power Advisor website
Содержание apollo 4510 gen9
Страница 20: ...Identifying components and LEDs 20 Optional 8 LFF drive cage bay numbering ...
Страница 32: ...Installing the chassis 32 Installing a management module Install the component as indicated ...
Страница 36: ...Installing the chassis 36 2 Connect the Smart Storage Battery cable to the Smart Storage Battery connector ...
Страница 60: ...Support and other resources 60 ...
Страница 61: ...Support and other resources 61 ...
Страница 64: ...Acronyms and abbreviations 64 UPS uninterruptible power system USB universal serial bus ...
Страница 68: ...Index 68 W warranty 46 warranty information 46 website Hewlett Packard Enterprise 54 ...