Installation procedures—All deployments
34
d.
Loosen the locking nut on the shipping retaining bracket and slide the bracket to the farthest
position on the rear of the rail.
e.
Repeat steps a through d for the left rack rail.
4.
Install the component in the rack:
a.
Remove the bezel from the front of the device, align the device with the rails, and slide it into
the rack.
2
1
Содержание AD510A - StorageWorks Modular Smart Array 1500 cs 2U Fibre Channel SAN Attach Controller Shelf Hard Drive
Страница 60: ...Installation procedures All deployments 60 ...
Страница 66: ...Configuration procedures Windows environments 66 ...
Страница 72: ...Configuration procedures Linux environments 72 ...
Страница 78: ...Configuration procedures HP UX environments 78 ...
Страница 84: ...Configuration procedures OpenVMS environments 84 ...
Страница 96: ...Configuration procedures Other environments 96 ...
Страница 100: ...Powering off and powering on the MSA 100 ...
Страница 106: ...Electrostatic discharge 106 ...
Страница 126: ...126 ...